Recent Projects

 
 

monsignor Michael Glenn Recreation Center

This 14,500 square foot Recreation Center on the St John Vianney Campus was our latest project completed within the Archdiocese of Denver.

Horizon West Builders was brought on board at conceptual design and was instrumental in the decision to make the building brick to fit the campus instead of a stucco box.

The mild winter helped us deliver the building on time and was an extremely successfully project.


Mother Cabrini Shrine - Golden Colorado

Horizon West Builders was brought onto the team with Mother Cabrini Shrine and Integration Design Group in late 2020. During our preliminary meetings we were able to identify a phasing plan that allowed the Shrine to complete their gift shop renovation (Phase 1) during their slow period. We were able to complete the project a week before our deadline of Memorial Day. This stunning chapel features a 25' tall Italian Mosaic, new mechanical, lighting, restrooms and amenities you'd expect a 500 person Church to have.

St. John Paul II, Thornton, Colorado

Horizon West Builders has partnered with IDG and John Paul II Catholic Church to build a new 10,000 square foot church. In order to build the church, Horizon West will be developing the 25 acre greenfield site and a $16,000,000 project budget. The infrastructure work will include public roadways, private roadways, storm sewer and detention, sanitary sewer, water mains for domestic and fire service and all of the private utilities and private paving that comes along with a new church.


Society of the most sorrowful mother, Keenesburg, CO

Horizon West Builders teamed up with Integration Design Group and Father Chad Ripperger for a design build of this private residence. The construction included updates to the residence as well as the addition of a beautiful Chapel.



TruFit-1.jpg

Trufit Atheletic Club, Ft. Collins, CO

Horizon West Builders was brought in at the early stages of this project to work with RBB Architects to design and build a 28,000 square foot athletic facility. The club is truly a high class contemporary workout facility with all of the amenities. a beautiful open lobby with a fireplace, beautiful locker rooms, sauna, and kids club on the first floor and on the second floor you can find the cardio equipment, free weights and circuit training Equiptment. TruFit was completed in the Summer of 2018.


St. Elizabeth Ann Seton Catholic Church, Ft. Collins CO

Horizon West Builders won this job through a competitive bid process and was able to work with Eidos Architects and the parish project team to make the project happen. They worked through budget constraints with value engineering options even after the competitive bid to save even more. The building is set to be completed in April of 2019.


St.Frances Cabrini, Lakewood, CO

Horizon West Builders was brought into this project early on to consult with Eidos Architects for a design build. For this 34,000 sq. ft. remodel the space featured new lighting, flooring, paint and finishes.


St.Peter Catholic Church, Greeley, CO

Integration Design Group brought in Horizon West Builders to complete this project because of our attention to detail and our ability to execute. The project was a complete historic restoration from the floor boards, to the insulation, to the decorative paint.


Screen Shot 2019-09-06 at 9.59.59 AM.png

Little Sisters of the Poor, Chapel Renovation, Denver, CO

Little Sisters chose Horizon West Builders to work with Integration Design Group Architect’s to assist in the design build of this beautiful chapel renovation. We helped to restore the beauty and simplicity of the original barrel vaulted ceiling that was covered up in a past renovation that truly defines the space. All new lighting, pews, and flooring helped bring it back to its former glory.


Shrine of St. Anne - Arvada Colorado

Horizon West Builders worked with Eidos Architects on this project. For the 100 year anniversary the church was refreshed and rejuvenated. New pews, flooring, lighting and HVAC systems.