Recent Projects

 
 

Mother Cabrini Gift Shop-Golden Colorado

Horizon West Builders was brought in early on to work with Integration Design Group to work through a 3 phase project. The first of the 3 phases is the gift shop and a new conference room. The next two phases are going to address the need for more space in the chapel and also adding a flex space at the back of the chapel.


Shrine of St. Anne - Arvada, Colorado

Horizon West Builders was brought in early on this project to work with Eidos Architects on the design build. This project is a renovation of 5,600 sq. ft. of worship space that includes new insulation, HVAC, Lighting/Lighting Controls, pews, and flooring. There are many challenges when it comes to working in a 100 year old building but the project team was able to identify most of them in the preconstruction phase with the Architect and Engineers.


TruFit-1.jpg

Trufit Atheletic Club, Ft. Collins, CO

Horizon West Builders was brought in at the early stages of this project to work with RBB Architects to design and build a 28,000 square foot athletic facility. The club is truly a high class contemporary workout facility with all of the amenities. a beautiful open lobby with a fireplace, beautiful locker rooms, sauna, and kids club on the first floor and on the second floor you can find the cardio equipment, free weights and circuit training Equiptment. TruFit was completed in the Summer of 2018.


St. Elizabeth Ann Seton Catholic Church, Ft. Collins CO

Horizon West Builders won this job through a competitive bid process and was able to work with Eidos Architects and the parish project team to make the project happen. They worked through budget constraints with value engineering options even after the competitive bid to save even more. The building is set to be completed in April of 2019.

SEASCO_BRO(GG)_2.jpg

DSC00051.JPG

St. Jude Catholic Church, Lakewood, CO

Horizon West Builders was brought into this project early on to consult with Eidos Architects for a design build. St. Jude was in dire need of a renovation, the last one was in the 70’s and they had only a single bathroom on the main floor for the whole church. At St Jude we completed a 3,000 sqft addition featuring 10 bathroom stalls and an elevator, while updating the finishes, lighting, fire sprinkler and alarm, HVAC and sitework. St. Jude was completed in the Summer of 2019.


Front Range Village, Fort Collins, CO

At the time HWB was working on Trufit for RPT Realty, they were so pleased with the project they hired HWB to complete this project on the same property. Horizon West Builders was hired to take the existing 45,000 sq ft. former Sports Authority space and split it up into two new spaces. In this project we added two new store front façade’s, added bathrooms, split the loading dock, and separated all of the utilities for each unit.

GPTempDownload.jpg

Screen Shot 2019-09-06 at 9.59.59 AM.png

Little Sisters of the Poor, Chapel Renovation, Denver, CO

Little Sisters chose Horizon West Builders to work with Integration Design Group Architect’s to assist in the design build of this beautiful chapel renovation. We helped to restore the beauty and simplicity of the original barrel vaulted ceiling that was covered up in a past renovation that truly defines the space. All new lighting, pews, and flooring helped bring it back to its former glory.


Gardens At Columbine, Littleton, CO

Horizon West Builders worked with Eidos on this project and the results were beautiful. They took an outdated lobby and entryway completely redesigned everything. The biggest challenge was keeping everything open while the renovation was completed, this was especially difficult because it is an assisted living facility. The project was Completed in November of 2018.